ROI HubAdditional Costs Estimator
Additional Costs Estimator
Your total project budget goes beyond the AirDome itself and may include foundation, permitting, preparation works, and utility connections. This tool helps you plan those costs.
Project Configuration
Perimeter
360.0 ft
Area
7200.0 ft²
The figures shown are estimates only and provided for planning purposes. Actual costs may vary based on site conditions, local regulations, labor rates, material availability, engineering requirements, and final project scope.
Cost Breakdown
Grade Beam Foundation
$144,000Permitting & Approvals
$20,000Site Preparation & Materials
$3,600Utilities Connections
$72,000Cranes/Lifts
$3,600Temporary Workforce
$14,400HVAC Integration
$19,440General Contracting Fee
$59,760Total Estimated Additional Costs$336,800